CM.L2-3.4.3 — Track, review, approve, and log changes
Track, review, approve or disapprove, and log changes to organizational systems.
Verbatim NIST SP 800-171 Rev 2 requirement text (3.4.3).
How it's scored
1 point deducted from your SPRS score if unmet.
An open gap here may sit on a POA&M at conditional Level 2 certification (32 CFR 170.21), provided your total score is at least 88 of 110 — and it must close within 180 days of the conditional status date.
What an assessor checks: the 4 assessment objectives
NIST SP 800-171A determination statements, verbatim. A CMMC Level 2 assessor marks CM.L2-3.4.3 MET only when every applicable objective is satisfied — and examines evidence, not assertions.
| Objective | Determination statement |
|---|---|
| 3.4.3[a] | changes to the system are tracked. |
| 3.4.3[b] | changes to the system are reviewed. |
| 3.4.3[c] | changes to the system are approved or disapproved. |
| 3.4.3[d] | changes to the system are logged. |
Where do you stand on CM.L2-3.4.3?
The free Muster Score walks all 110 requirements — including every objective above — and computes your exact SPRS score in your browser. No signup, no upload, and your answers never leave your device.
Get your free Muster Score →Requirement and objective text: NIST SP 800-171 Rev 2 / SP 800-171A (verbatim). Scoring: DoD Assessment Methodology v1.2.1; POA&M eligibility: 32 CFR 170.21. Muster is independent and not affiliated with the U.S. Department of Defense or the Cyber AB; this page is compliance information, not legal advice or a certification.